Call or text604 726 4297

Epoxy and concrete floor contractors specializing in

Commercial & industrial concrete floors

Industrial & commercial epoxy concrete floor coatings Toronto

Protecting Ontario floors

Protect, preserve and upgrade the concrete floors you walk, park and work on every day. Sterling Surfaces installs epoxy, urethane cement and polished concrete systems for commercial and industrial facilities across the Greater Toronto Area and Ontario. Every floor is specified from a documented site assessment with moisture testing, installed to the manufacturer's data sheets and phased around your operations.

  • Property managers & contractors
  • Warehouses & manufacturing facilities
  • Food, beverage & pharmaceutical plants
  • Logistics centres & industrial parks
  • Mechanical, electrical & generator rooms
  • Commercial & industrial buildings
Seamless red urethane cement floor in a food processing plant

Why should you coat or polish concrete floors?

Crew applying grey epoxy to an industrial floor at night

First, coat your floors for savings. Bare concrete dusts, absorbs oil and chemicals and spalls at the joints. A specified coating or polish seals the slab and takes the abuse, so you avoid the cost of extra cleaning, floor repairs and concrete replacement caused by:

  • Heavy forklift and industrial traffic
  • Spills and stains from oil, coolant or chemicals
  • Penetration by water and corrosive de-icing salt
  • Thermal shock from hot washdown, and freeze-thaw
  • Moisture vapour rising through the slab

Second, a protective floor changes how a facility reads. Light-reflective finishes cut lighting load, marked aisles and hazard zones keep people and forklifts apart, and seamless coved floors pass the audits that food, beverage and pharmaceutical facilities face. Sterling Surfaces installs high gloss, semi-gloss and matte finishes, with slip-resistant texture wherever the floor gets wet.

Beyond the floor itself, you get a written assessment report and specification before any work starts, so you know what is going down, why, and how long it will last.

Compare systems

Products & services

Epoxy & urethane coatings

Industrial epoxy for warehouses, production floors and docks.

  • 100% solids high-build epoxy
  • Quartz and flake broadcast for slip resistance
  • Urethane topcoats for UV and abrasion
  • Polyaspartic fast-return systems

Chemical-resistant & food-grade floors

Urethane cement and novolac where ordinary epoxy fails.

  • Urethane cement, 4 to 9 mm, thermal shock and hot washdown
  • Novolac for acids, caustics, solvents and sugars
  • Integral cove base and drain detailing

Epoxy overlayments & repairs

The substrate work that decides whether a floor lasts.

  • Shot blasting and diamond grinding
  • Joint, crack and spall repair
  • Trench, pit and curb reconstruction
  • Self-levelling overlays, moisture vapour mitigation

Polished concrete

Densified, polished slabs for distribution and commercial space.

  • Grind, densify, hone and polish to specified gloss
  • Dust-proofing and stain protection
  • Lowest lifetime maintenance in dry traffic areas

Coloured safety lines

Durable striping that survives forklifts.

  • Aisle lines, pedestrian walkways, hazard zones
  • Dock and staging layouts
  • Recoats of worn markings

Parking garage traffic coatings

Waterproof, salt-resistant decks for commercial parking structures.

  • Elastomeric urethane traffic systems
  • Crack bridging and drain detailing
  • Line painting and wayfinding

Assessment & specification

Where every project starts.

  • Documented site assessment with photos and test results
  • Written specification and fixed quote
  • Recoat and repair programs, follow-up inspection

Maintenance programs

Keep the floor in service and the warranty valid.

  • Annual inspection and touch-up
  • Recoat scheduling before wear-through
  • Cleaning guidance for your crew

Floor coating systems

The right system depends on traffic, chemical exposure, slab moisture and how long you can be down. The assessment settles it.

Distribution warehouse with light grey epoxy floor and yellow safety lines
SystemBest forStrengthsLimitsReturn to service
High-build epoxyWarehouses, production floors, mechanical roomsLowest cost per sq ft, strong adhesion, easy to cleanYellows under UV without a topcoat3 to 5 days
Epoxy with urethane topcoatForklift aisles, shops, daylight areasAbrasion and scratch resistance, colour stableAdds a day3 to 5 days
PolyasparticFast-track jobs, retail, light industrialCures in hours, UV stable, works in coldHigher material cost, thinner build24 hours
Urethane cementFood and beverage, kitchens, breweries, wash baysThermal shock, hot washdown, acids and sugars, moisture tolerantHighest cost, limited colours24 to 48 hours
Novolac epoxyChemical storage, battery rooms, process areasConcentrated acids, caustics, solventsAmber tint, needs a topcoat in impact zones3 to 5 days
Polished concreteDistribution centres, showrooms, corridorsNothing to wear through, lowest lifetime maintenanceNot for chemical or wet process areasImmediate
Traffic coatingParking decks, ramps, loading areasWaterproof, flexible, salt resistantNeeds recoat every 5 to 7 years in drive lanes24 to 72 hours

Gallery

From site visit to handover

Site assessment

Moisture testing, substrate condition, exposure review and downtime windows. You receive a written report.

Specification and quote

Prep method, system build, cure times and a fixed price. Alternates priced where it helps your budget.

Phased installation

Mechanical prep, repairs, then the system, zoned so your facility keeps running. Nights, weekends and shutdowns.

Handover and care

Return-to-service schedule, maintenance guide, warranty documents and a follow-up inspection.

What our clients say

Testimonial to be added

Name · Title · Company

Testimonial to be added

Name · Title · Company

Testimonial to be added

FAQ

How long will my floor be out of service?

Standard epoxy returns to foot traffic in about 24 hours and forklift traffic in 3 to 5 days. Polyaspartic and urethane cement can return in 24 to 48 hours. We phase by zone so the whole floor is never down at once.

Why do you test for moisture first?

Moisture vapour through the slab is the leading cause of coating failure. Relative humidity testing tells us whether a standard system will hold or a mitigation layer is required.

Epoxy or polished concrete?

Polished concrete wins in dry, high-traffic areas: nothing to wear through and the lowest lifetime maintenance. Epoxy or urethane cement wins wherever there is chemical exposure, wet process or washdown. Many facilities use both.

Can you work around production?

Yes. Most industrial work is done nights, weekends or during planned shutdowns, in zones agreed with your maintenance or operations lead.

What does an assessment cost?

Nothing. The site assessment and written report are free for commercial and industrial facilities in the Greater Toronto Area. Other Ontario locations on request.

Do you do residential garages?

No. Sterling Surfaces works on commercial and industrial facilities only.

Request information

No obligation. We reply within one business day.

Thanks. Your request is noted. We will reply within one business day.

Connect with us

604 726 4297 [email protected] Toronto, Ontario

Service area

Greater Toronto Area first. Other Ontario locations on request.

TorontoMississaugaBramptonVaughanMarkhamEtobicokeScarboroughOakvilleBurlingtonHamiltonMiltonPickeringAjaxOshawaGuelphKitchener-WaterlooBarrie
© 2026 Sterling Surfaces · Industrial & commercial epoxy concrete floor coatings · Toronto, Ontario. All rights reserved.